Two Financial Centre
This project was a design build solution by Powers that transformed a poorly operating HVAC system into an efficient system that also increased the occupant comfort level. The DX AHU was leaking and inefficient. The VAV boxes were poorly zoned and not controlling properly due to outdated pneumatics and lack of volume control.